Steel Factory Building

Steel Factory Building

Specification of Steel Factory Building
ProjectSteel Factory Building
Size15000 Square meter , Length :150m , Wide : 100m ,
Eave Height :13.5m,Crane Height :10m ,Crane Lifting Capacity : 10Ton
Wind loading0.5kn/m2
Live loading0.3kn/m2
Dead loading0.5kn/m2
Steel ColumnQ345B Welding H section Steel Beam
Steel BeamQ345B Welding H section Steel Beam
Crane BeamQ345B Welding H section Steel Beam
Roof BracingQ235B Steel Rod
Wall BracingQ235B Steel Rod
Fly BracingQ235B Angle Steel
Tie BeamQ235B Welding Pipe
Wall PurlinGalvanized C section steel
Roof PurlinGalvanized C section steel
Roof Panel0.5mm Corrugated Color sheet with Skylight Sheet
50mm Glass wool inslation with aluminum foil
Wire mesh ( used avoid the leaking of glass wool insulation
Wall Sheet0.5mm Corrugated Color sheet
PaintedEpoxy Zinc-rich Painted , three layer
Advantages of  Steel Factory Building
1)Steel Factory Building is better than traditional architecture can meet the requirements of construction are better meet the requirements of large bays separated by flexible, and by reducing the cross-sectional area of the column, increase the area of utilization, effective use of area increases by about 6%.
2)Steel Factory Building energy saving effect is good, the wall using light energy saving standardized C steel, square steel, sandwich board, heat preservation performance is good, good anti-seismic. Energy saving 50%.
3)Steel Factory Building can give full play to the good ductility of steel structure and plastic deformation ability , it has excellent aseismic performance, wind resistance  greatly increased the safety and reliability of the building,especially in the case of earthquake, typhoon disaster, steel structure warehouse can avoid disruptions to the collapse of buildings
4)Steel Factory Building with the advantage of light weight , steel structure  approximately half of the concrete structure, can greatly reduce the cost
5) Steel Factory Building Quickly construction , shorten at least a third period than the traditional building system,  1000m2 steel building  only 20 days before completion, five workers.
Design StandarnChina Standarn
Production Time50days